Yes, the Ohio Revised Code requires the County to approve and supervise all work performed within County Right of Way. See the Forms page on this website for applications.
No, the County Engineer can act as an engineering advisor for Township Trustees but does not oversee their operations in any way.
Yes, the Ohio Revised Code requires the County to approve and supervise all work performed within County Right of Way. See the Forms page on this website for applications.
No. Contact the County Commissioner’s office for information pertaining to building codes and zoning. The Engineer’s Office does not issue Occupancy Permits, Sign Permits or any permits needed for home or commercial construction.
Assigning rural house numbers is the responsibility of the Belmont County 911 Center. They can be contacted at 740-699-0399.
The Engineer’s Office receives the majority of its funding from two sources: A portion of the gasoline tax and a portion of the license plate fee. In addition, the Engineer actively applies for state and federal grants. We receive NO revenue from property taxes or sales taxes. The County Commissioners have also contributed from their general fund, but they are not required to contribute anything towards road and bridge maintenance.
There are 280 bridges on township and county roads. A “bridge” is defined as being a structure over 10 feet long as measured between the abutments. The longest bridge on the County Engineer’s inventory is 200 feet in length and spans McMahon Creek just outside of the village of Bellaire.
The Belmont County Engineer is responsible for 301 miles of roadway. This is a mix of paved, gravel and shoot & chip roads.
Right-of-way is the land that a public road occupies. It generally measured a certain distance from the center of the traveled road and usually includes the ditches, culverts and banks. The width of road rights-of-way vary depending on the year that the road was originally surveyed and established. Roads in Belmont County can date back to 1803. The minimum right of way is 30 feet (measured 15 feet from the center of the road) with the maximum being 60 feet (measured 30 feet from the center of the road).
Current funding doesn’t allow for a yearly paving schedule. The Engineer’s Office has had success recently working with the oil and gas industry to get some roads paved, and even a few bridges replaced. In addition, the County Commissioners have funded some road and guardrail projects. We will continue to pave roads whenever funding is available.
A deed description can be stamped POOR for a variety of reasons. Ultimately the property will need to be surveyed and a new description filed to correct this situation. You can find more information about REQUIREMENTS FOR EXISTING METES AND BOUNDS DESCRIPTION OF RECORD in the Conveyance Standards by clicking HERE.
Over the past several years, our revenue has remained fairly stagnant while material and labor costs have soared. The problem isn’t just here in Belmont County; cities, counties, and villages all over the country are facing the same issue. See the chart below for a brief explanation of what rising prices have done here in Belmont County.
No. The County Engineer can only expend funds on public roadways and bridges under his jurisdiction. Creeks and streams are on private property and are the responsibility of the land owner.

County Road 20 Blaine Chermont To Close – Extended to Wednesday

Belmont County Road 20 (Blaine – Chermont Road) will be closed to all traffic on Monday September 22nd through Wednesday September 24rd between the hours of 9:00 A.M. and 2:00 P.M.

 The road will be closed 0.75 miles south of County Road 18 (Chermont Road) for a culvert replacement.